The metropolitan administration

L'administració metropolitana

As a result of the municipal elections held in May 2015, a new metropolitan government was established the following July and the second mandate of the AMB got underway. This mandate is now ending, but during it this supralocal public institution established with the approval of the 2010 Law on the Barcelona Metropolitan Area has gained ground.

The economic adjustments in the past five years, as well as the austerity policies imposed, have signalled a turning point which public administrations have had to handle with a democratically mature citizenry.

In parallel, at the Paris Climate Summit, the Action Plan to Fight Climate Change was approved with the 2030 objectives; more than 195 countries signed it, dovetailing with the hottest year on record in terms of global temperatures. The priority objective of this Plan is to lower greenhouse gases with the engagement of all the social stakeholders and public administrations, not only on a state level but also regionally and locally.

The political map reveals the end of bipartisanship and the practice of more plural local governments in an ever-changing socioeconomic context with the entry of new political parties, which know no administrative nor authority limits, to hear the regional demands on the local, national and state scene. Nonetheless, we can say with satisfaction that the majority of the important issues of metropolitan interest have been negotiated, and a high level of consensus has been reached regarding the strategic avenues to pursue.

Given this reality, the AMB continues along its path by setting a roadmap whose priority is to manage the territorial, environmental, social, economic and mobility challenges, accompanied by management that is more open, transparent and accessible for citizens. These commitments coexist with the day-to-day provision of services and management of the investments that are intrinsic to the development of the metropolitan competences contained in Law 31/2010. 

  • Accountability and future challenges
    Now is the time for accountability, and by evaluating the actions and measures spearheaded, we can see that over these four years, the priorities established in the short, middle and long term have been implemented, based on the governing agreement.

    This governing agreement, which has eleven avenues of action and 25 sectoral objectives, takes shape in the approval of the 2016-2019 Metropolitan Action Plan (PAM), with more than 366 actions, and it rests on three major strategic strands: democratic quality, open governance, transparency and participation; metropolitan metabolism, sustainability and resilience; and quality of life, territorial cohesion and social rights.

    With almost 90 % of the Investment Plan executed, the AMB is satisfied with the work done so far.

    We are reaching the end of the mandate with the approval of the Proposal of the Metropolitan Urban Master Plan, as well as a Climate and Energy Plan 2030, which includes a roadmap in order to reach the objectives related to the metropolitan municipalities and the AMB itself in order to meet the goals to combat climate change set at the Paris Summit.

    We have set up a new public housing operator for publicly-subsidised rentals, which is one of the main actions within the metropolitan housing policy guidelines. During the implementation of these policies, we have managed almost 2,800 new publicly-subsidised homes in around 50 housing developments. Of this total, 250 are finished, 436 are currently being built, 883 are being designed and 1,257 are being processed in accordance with the agreements with the respective town halls.

    Towards the end of the mandate, we have also approved the initial phase of the Mobility Plan, which should help guarantee a region that is connected more efficiently and in a more environmentally-friendly way. This obligation stipulated by law has not yet gotten underway, and now we can say that we have approved the fare integration of the 18 municipalities in the second ring with a formula that ensures the financing of the public transport system (PTS), as well as the increases needed to safeguard it.

    Furthermore, we have added budget allocations to deal with situations of energy vulnerability via the Metropolitan Plan to Support Municipal Social Policies, and in this vein it is also important to highlight the launch of the metropolitan energy operator.

    The budgets in this mandate have enabled us to fulfil the commitment to earmark 0.7 % of the budget to international cooperation.

    This mandate has also been tenacious and rigorous with green infrastructure and environmental policies. The measures include the initial approval of the Special Plan to Protect the Parc Natural de la Serra de Collserola, becoming a member of the Parc Agrari Consortium and the request to join the Consortium to Protect the Natural Spaces of the Delta del Llobregat, the creation of the urban planning discipline service of the townships of each municipality included within these spaces, and the approval of the Metropolitan Plan to Prevent and Manage Municipal Resources and Waste (PREMET25), which harnesses waste so it can be treated as a resource. All of these actions serve as proof of our commitment. We have also approved a five-year investment plan to improve sanitation infrastructures, and we have made headway towards drafting the Comprehensive Water Cycle Master Plan. All of these measures have increased our region's resilience in terms of the essential elements (like water) for the functioning of both the natural ecosystems and urban systems within the perspective of the circular economy.

    We should also underscore the effort entailed in joining the ERDF programme with our own agreement, which means actions and projects that will unquestionably bring added value to the region, with more services, improved infrastructures, more energy efficiency and the ability to showcase the natural heritage.

    In terms of interventions in the region, over these four years we can highlight the execution of the investment plans, in which the PACTE (Regional Cohesion Action Programme), the PAMUS (Action Programme for Urban and Social Improvement) and the technical assistant programs for municipalities are now joined by the PSG (Action Programme in Natural and Urban Landscapes), in an effort to continue improving river spaces, mitigating the impacts of infrastructures and managing contact areas between natural and urban spaces. We have expanded the park network until reaching 51 parks and have undertaken more than 415 actions in the public space. Another important action which serves as the backbone of the metropolitan area is the studies of the transformation of the main roadway arteries, such as Diagonal/B-23 and the C-31, and the approval and development of the executive project of the C-245 motorway. These projects have required major interinstitutional coordination.

    The creation of the Economic Development Agency was a noteworthy development as a governing instrument within the metropolitan area with the goal of meeting the common social and job needs in the metropolitan region. In this sense, also worth noting is the completion of the subsidy programme for economic activity estates and the continuation of the Metropolitan Plan to Support Municipal Social Policies, with the execution of the jobs programme.

    We also made a commitment to make the institution more available to citizens. Open governance and transparency are core aspects of this objective, and we have created the Transparency Agency in order to further this new way of engaging in public service.

    The Strategic Planning Area worked to monitor, evaluate and plan the new metropolitan challenges for a resilient region from a cross-cutting perspective. This took shape in the DREAM Programme, the abbreviation for metropolitan diagnosis, reflection and analysis, which outlines the different future scenarios awaiting us. These contributions are collected in the publications in the DREAM series. Also worth highlighting is the creation of debate and participation groups on socio-ecological conflicts, which initially revolved around metropolitan agricultural and forest management, river spaces and air pollution.

    In recent years, we have undergone many changes, overcome difficult times and tackled adversities as veritable opportunities. The strategy has been unwavering: working tirelessly to maintain a commitment that excites us, and designing and building a metropolitan area that is friendly and inhabitable for all citizens, a city of cities that integrates and advocates for the common good.

    Cooperation among the municipalities and governance of the different working areas will no doubt be the challenges that await us in the future.

    The quest for major agreements and coordination with the different institutions and the social and economic stakeholders should be the lodestar for attaining the consolidation of this institution and its collaborative project for the metropolitan region of Barcelona as a whole, in order to address social issues in all their facets, thinking and acting to make the right to city a reality, meant as the large urban whole with unique identities yet shared projects: the environmentally sustainable, economically prosperous and socially cohesive city above and beyond its administrative boundaries.

    April 2019

    Ada Colau
    Antonio Balmón
  • Agreement, governing priorities and Metropolitan Action Plans (PAM)
    The governing agreement of the Barcelona Metropolitan Area, signed in 2015 by the PSC-PC, Entesa pel Progrés Municipal and ERC-AM, is arranged around 11 avenues of action and 25 sectoral objectives. The establishment of the new government signalled a new stage characterised by a cross-cutting way of addressing all the issues and problems related to the metropolitan challenge.

    The political forces that signed the agreement marked the start of a broader political leadership process to deal with the negative consequences of the economic crisis and the generation of social inequalities. The agreement has set objectives and avenues of work for the metropolitan administration established in the Metropolitan Action Plan 2016-2019 to dynamise economic activity, social inclusion, territorial balance, sustainable mobility and urban and ecological environmental metabolism as the core of the policies to be undertaken.

    Sustainability and quality in public services

    As a priority, the metropolitan government agreed to work to guarantee the sustainability and quality of the public services that are essential to the functioning of the city and the metropolitan region: the collective urban public passenger transport system, waste prevention and management, administration of the comprehensive water cycle, public facilities and space, infrastructures and open spaces, action programmes within the sphere of energy and affordable housing, and services related to economic promotion, and social and environmental sustainability.

    At the same time, Law 19/2014 on transparency, access to public information and good governance was implemented with the creation of the Transparency Agency after being enacted by the Parliament of Catalonia on 29 December 2014.

    The main avenues of action of this mandate have been:

    • Viewing the metropolis as a network of towns and cities
    • Promoting the recovery and guarantee of metropolitan social cohesion 
    • Developing a metropolitan housing policy as a service of general interest 
    • Promoting the economic activity
    • Promoting and consolidating a sustainable mobility system based on public transport
    • Providing services to protect natural resources and the environment with the utmost quality and efficacy possible
    • Promoting quality of life in the metropolitan municipalities and neighbourhoods
    • Protecting natural systems and preserving open spaces
    • Establishing a sufficient, stable financing system for the metropolitan services
    • Guaranteeing citizen accessibility and participation
    • Promoting the AMB's relations with international bodies 
    Agreement for the governance of the Barcelona Metropolitan Area. 2015-2019 mandate. PSC-CP / ENTESA PEL PROGRÉS MUNICIPAL / ERC-AM
    • Metropolitan Action Plan (PAM 2016-2019)
      With the mission of attaining a fairer, more democratic and sustainable metropolitan region, the Metropolitan Action Plan 2016-2019 is organised into three strategic strands:

      • Social rights, sustainable economic development and territorial cohesion.
      • Metabolism, sustainability and resilience.
      • Government, governance and democratic quality.
      The PAM consists in 22 avenues of intervention with 366 actions around the region, as established by the roadmap of the mandate:

      The establishment of the new metropolitan government for the current mandate, after a period in which the new institution was consolidated, has signalled a new stage in which the priority has been to address all the issues and problems related to metropolitan development in a cross-cutting way, while also starting a process of stronger political leadership to deal with the fallout of the economic crisis, especially in terms of the social inequalities generated.

      Efforts have been made to create an inclusive metropolitan area in order to stop the deepening of inequalities by applying measures to support entrepreneurs in a productive, collaborative economy, without ignoring actions to benefit socioeconomic progress and the protection of the environment, the region and people.

      The PAM has paid special attention to guaranteeing the sustainability of the essential public services, such as the collective urban public passenger transport system, waste prevention and management, administration of the comprehensive water cycle, urban planning, regional actions to maintain and invest in public facilities and space, infrastructures and open spaces, action programmes within the sphere of energy and affordable housing, and services related to economic promotion and social and environmental sustainability.

      Promoting ways and methods of governing and planning in accordance with institutional transparency, participation, information and accountability to citizens has also been a crucial factor in the decisions taken by the new metropolitan government in relation to the PAM.

      To date, the PAM has accomplished 92 % of what it set out to do.

      PAM 2016-2019
  • Representatives and organisational structure
    The 2011 replacement of the three metropolitan entities – the Commonwealth of Municipalities of the Barcelona Metropolitan Area (MMAMB), the Metropolitan Transport Entity (EMT) and the Metropolitan Hydraulic Services and Waste Treatment Entity (EMSHTR) – led to the unification of their governing and management bodies, which also led to a decrease in the number of representatives (from 150 to 90 metropolitan councillors).

    Governing bodies of the AMB
    • Metropolitan councillors
      On 18 March 2019:

      Badalona Àlex Pastor López (PSC-CP)
      José Antonio Téllez Oliva (Guanyem Badalona en Comú-Poble Actiu)
      Rosa Bertran Bartomeu (PP)
      Miguel Jurado Tejeda (PP)
      Badia del Vallès Eva Menor Cantador (PSC-CP)
      Barberà del Vallès Sílvia Fuster Alay (Plataforma Ciutadana per Barberà)
      Fabià Díaz Cortés (Junts per Barberà)
      Barcelona Ada Colau Ballano (Barcelona en Comú-Entesa)
      Josep Maria Montaner Martorell (Barcelona en Comú-Entesa)
      Eloi Badia Casas (Barcelona en Comú-Entesa)
      Janet Sanz Cid (Barcelona en Comú-Entesa)
      Gala Pin Ferrando (Barcelona en Comú-Entesa)
      Agustí Colom Cabau (Barcelona en Comú-Entesa)
      Mercedes Vidal Lago (Barcelona en Comú-Entesa)
      Irma Rognoni i Viader (CiU)
      Raimond Blasi i Navarro (CiU)
      Xavier Trias i Vidal de Llobatera (CiU)
      Jordi Martí i Galbis (CiU)
      Mercè Homs i Molist (CiU)
      Francina Vila i Valls (CiU)
      Carina Mejías Sánchez (Ciutadans-Partido de la Ciudadanía)
      Santiago Alonso Beltrán (Ciutadans-Partido de la Ciudadanía)
      Koldo Blanco Uzquiano (Ciutadans-Partido de la Ciudadanía)
      Montserrat Benedí i Altés (ERC-MES-BcnCO-Avancem-CatSI-AM)
      Trini Capdevila i Burniol (ERC-MES-BcnCO-Avancem-CatSI-AM)
      Jordi Coronas i Martorell (ERC-MES-BcnCO-Avancem-CatSI-AM)
      Jaume Collboni i Cuadrado (PSC-CP)
      Daniel Mòdol i Deltell (PSC-CP)
      Alberto Fernández Díaz (PP)
      Alberto Villagrasa Gil (PP)
      Pere Casas Zarzuela (CUP-Capgirem Bcn-PA)
      Eulàlia Reguant i Cura (CUP-Capgirem Bcn-PA)
      Begues Mercè Esteve i Pi (CiU)
      Castellbisbal Joan Playà Guirado (Alternativa per Castellbisbal-Entesa)
      Castelldefels María Asunción Miranda i Cuervas (PSC-CP)
      Candela López Tagliafico (ICV)
      Cerdanyola del Vallès Carles Escolà Sánchez (Compromís per Cerdanyola-CAU-Poble Actiu)
      Helena Solà i Tàrraga (ERC-AM)
      Cervelló José Ignacio Aparicio Ciria (M'estimo Cervelló-PSC-CP)
      Corbera de Llobregat Montserrat Febrero i Piera (ERC-AM)
      Cornellà de Llobregat Antonio Balmón Arévalo (PSC)
      Antonio Martínez Flor (PSC-CP)
      Manuel Ceballos Morillo (PSC-CP)
      El Papiol Joan Borràs Alborch (ERC-AM)
      El Prat de Llobregat Lluís Tejedor Ballesteros (ICV)
      Alba Bou Jordà (ICV)
      Esplugues de Llobregat Pilar Díaz Romero (PSC-CP)
      Eduard Sanz García (PSC)
      Gavà Raquel Sánchez Jiménez (PSC-CP)
      Rosa Maria Fernández Labella (PSC)
      L'Hospitalet de Llobregat Núria Marín Martínez (PSC-CP)
      José Castro Borrallo (PSC-CP)
      Manuel Brinquis Pérez (PSC-CP)
      Miguel Manuel García Valle (Ciutadans-Partido de la Ciudadanía)
      La Palma de Cervelló Xavier González Alemany (La Palma Sempre)
      Molins de Rei Ramon Sànchez Gil (CiU)
      Eduard Suárez Rovira (ERC)
      Montcada i Reixac Laura Campos Ferrer (ICV-EUiA-Entesa)
      Jordi Sánchez i Escrigas (ERC)
      Montgat Rosa Funtané i Vilà (ERC-AM)
      Pallejà Ascensión Ratia Checa (Entesa per Pallejà)
      Ripollet José María Osuna López (Ara Decidim Ripollet-CAV-CUP-Poble Actiu)
      Juan Parralejo Aragoneses (PSC) 
      Sant Adrià de Besòs Joan Callau i Bartolí (PSC)
      José Luis Martínez Cardoso (PSC)
      Sant Andreu de la Barca Manel Enric Llorca Ibáñez (PSC)
      Xavier Pla Gómez (Ciutadans)
      Sant Boi de Llobregat Lluïsa Moret i Sabidó (PSC-CP)
      Juan Antonio Tamayo Fernández (PSC-CP)
      José Ángel Carcelén Luján (PSC-CP)
      Sant Climent de Llobregat Isidre Sierra i Fusté (CiU)
      Sant Cugat del Vallès Carles Brugarolas Conde (CiU)
      Carmela Fortuny i Camarena (CIU)
      Cristina Paraira i Beser (CiU)
      Sant Feliu de Llobregat Jordi San José Buenaventura (ICV-EUiA-Entesa)
      Javier Molina Flores (PSC-CP)
      Sant Joan Despí Antoni Poveda Zapata (PSC-CP)
      Belén García Criado (PSC-CP)
      Sant Just Desvern Josep Perpinyà i Palau (PSC-CP)
      Sant Vicenç dels Horts Francisco Rodríguez Garzón (Junts x SVH)
      Maite Aymerich Boltà (Junts x SVH)
      Santa Coloma de Cervelló Gerard Segú i López (Progrés-Entesa)
      Santa Coloma de Gramenet Núria Parlón Gil (PSC)
      Esteve Serrano Ortín (PSC-CP)
      Lídia Montero Cos (PSC-CP)
      Jordi García Jané (Som Gramenet-Poble actiu)
      Tiana Esther Pujol Martí (PSC-CP)
      Torrelles de Llobregat Isabel Martínez Soriano (Compromís i Acord per Torrelles)
      Viladecans Carles Ruiz Novella (PSC)
      Pere Gutiérrez Alemany (PSC-CP)

      Metropolitan Council
    • President and vice-presidents
      President:
      Ada Colau

      Executive Vice-president:
      Antonio Balmón Arévalo

      Vice-presidents:

      Vice-president Núria Marín i Martínez PSC-CP
      Vice-president Lluís Tejedor Ballesteros Entesa pel Progrés Municipal
      Vice-president of Environment Eloi Badia Entesa pel Progrés Municipal
      Vice-president of Mobility and Transport Antoni Poveda Zapata PSC-CP
      Vice-president of Social and Economic Development Jaume Collboni PSC-CP
      Vice-president of International Affairs and Cooperation Maite Aymerich ERC-AM
      Vice-president of Strategic Planning Janet Sanz Entesa pel Progrés Municipal
    • Managerial posts of the AMB
      General Manager Ramon Torra i Xicoy CV
      Director of General Services Antoni Novel i Cabré CV
      Director of the Presidency Salvador Milà i Solsona CV
      Director of Public Space Services Xavier Segura i Grau CV
      Director of Urban Planning Services Josep Maria  Carrera i Quilis CV
      Director of the Mobility and Transport Area Joan Maria Bigas i Serrallonga CV
      Director of Transport Management and Administration Services   -- --
      Director of Sustainable Mobility Services Carles Conill i Vergés CV
      Director of the Environment Area Joan Pinyol i Ribas CV
      Director of Water Cycle Services Juan Ramón Vázquez García CV
      Director of Waste Prevention and Management Services  Joan Miquel Trullols i Casas CV
      Director of Environmental Services Isabel Doñate i Cubells CV
      Director of the Social and Economic Development Area  Héctor Santcovsky Grinberg  CV
      Director of the Strategic Planning Area  Francesc Magrinyà i Torner CV
      Director of the Area for International Relations and Cooperation Oriol Illa i Garcia CV
      Director of the Transparency Agency Gemma Calvet i Barot CV

      Managers of other AMB organisations:
      Director-General Manager of IMPSOL Amadeu Iglesias Unzué CV
      General Manager of IMET Maria Teresa Carrillo i Palacín CV
      Director of IMET services Pilar Molina Mesa CV

      More information
    • Entities dependent on or participating in the AMB
      The AMB has promoted outside projects via entities with different legal statuses in which it participates institutionally or is represented, such as consortia, foundations, associations, joint ventures, public companies of the AMB, etc.

      Entity search engine
  • Budget implementation
    The Barcelona Metropolitan Area, with its dependent companies and entities, has managed a budget of 6.4927 billion euros during the period 2016-2019, around 2.7577 billion euros of which was available to the AMB. Of this amount, 751 million corresponds to financial year 2019.

    The budgetary structure of the AMB, as an eminently technical administration aimed at providing advanced public services, stands out for the low percentage of resources allocated to personnel, current expenses and financial expenses, at under 9 %, and for earmarking the remaining 91 % to financing investments and end services (transports, waste management, environment, beaches and parks).

    The purpose of the budgets has been to guarantee the provision of the services provided by the metropolitan administration, as well as to maintain the investment capacity in plans, programmes and investment projects for the 2016-2019 mandate. In this period, the AMB has furthered its social policies, particularly to guarantee the right to access to both housing and public services, such as transport and basic utilities, in addition to promoting sustainable economic development.

    Income and expenses

    INCOME Initial budget Initial budget Initial budget Initial budget TOTAL
    2016 2017 2018 2019 2016-2019
    INCOME (THOUSANDS OF EUROS) 2016-2019 BY ITEM 663.353,02 658.737,90 684.646,54 751.005,25 2.757.742,71
    MUNICIPAL CONTRIBUTIONS (S/PMTE/IBI) 186.962,23 180.623,02 183.778,60 187.022,54 738.386,38
    TRANSPORT AND MOBILITY 132.549,23 137.878,14 144.415,20 162.540,19 577.382,77
    METROPOLITAN TAX, 1ST AND 2ND RING 2019  111.650,00 101.634,90 103.870,86 123.296,02 440.451,78
    METROPOLITAN WASTE MANAGEMENT TAX 99.642,05 113.883,00 118.438,32 124.740,88 456.704,26
    WASTE MANAGEMENT 37.606,10 39.166,59 40.750,15 49.090,07 166.612,91
    COMPREHENSIVE WATER CYCLE 82.183,13 71.630,33 78.494,71 86.319,15 318.627,32
    CONTRIBUTIONS TO MANAGE THE RING ROADS 7.111,00 7.111,00 7.111,00 7.111,00 28.443,98
    OTHER INCOME 5.649,28 6.810,93 7.787,70 10.885,40 31.133,31

    EXPENSES Initial budget Initial budget Initial budget
    Initial budget
    TOTAL
    2016 2017 2018 2019 2016-2019
    EXPENSES (THOUSANDS OF EUROS) 2016-2019 BY ITEM 663.353,02 658.737,90 684.646,55 751.005,25 2.757.742,72
    PERSONNEL + OVERHEAD AND EXPENSES OF SERVICE OPERATIONS  48.764,39 49.690,66 51.361,59 51.940,49 201.757,13
    FINANCIAL EXPENSES AND AMORTISATION OF CREDITS AND LOANS  22.982,76 23.026,00 11.536,00 5.950,50 63.495,26
    INVESTMENT AND REGIONAL MANAGEMENT (1) 101.501,13 102.691,27 109.174,89 122.120,16 435.487,45
    SUPPORT FOR INSTITUTIONS 7.893,13 4.644,94 5.037,38 5.007,02 22.582,47
    WASTE EXPENSES (2) 161.374,56 160.178,23 163.448,04 169.055,94 654.056,77
    COMPREHENSIVE WATER CYCLE EXPENSES (3) 61.334,54 53.618,35 56.347,68 63.986,05 235.286,63
    MISCELLANEOUS (INSPECTION, LABORATORY, ENVIRONMENTAL SERVICES) 2.936,05 2.671,87 2.792,01 2.034,78 10.434,71
    TRANSPORT AND MOBILITY (4) 251.626,06 255.959,96 277.986,23 323.522,70 1.109.094,96
    SOCIAL AND ECONOMIC DEVELOPMENT AREA - (SOCIAL POLICIES INCLUDED IN INV. MGMT. TERRITORY) 1.135,00 2.160,26 2.791,26 3.224,90 9.311,42
    AREA FOR INTERNATIONAL RELATIONS AND COOPERATION 1.658,10 1.749,06 1.914,16 1.974,66 7.295,98
    STRATEGIC PLANNING AREA 1.897,30 1.897,30 1.647,30 1.609,05 7.050,95
    TRANSPARENCY AGENCY 250 450,00 610,00 579,00 1.889,00

    DISTRIBUTION OF REGIONAL INVESTMENT AND MANAGEMENT (1)

     (1) 2016 2017 2018 2019 2016-2019
    Maintenance and investments in parks and beaches 15.054,86 14.392,07 13.985,49 14.396,70 57.829,13
    Investment Plan 56.961,63 48.277,98 53.415,36 65.971,01 224.625,98
    Metropolitan Plan to Support Municipal Social Policies – managed by ADES 9.000,00 9.001,00 9.001,00 9.400,00 36.402,00
    Actions from the agreement with the Barcelona Town Hall 11.333,33 11.333,33 11.333,33 34.000,00
    Habitatge Metròpolis Barcelona 2.000,00 2.000,00 4.000,00
    Fira 2000, SA 2.009,18 2.646,25 2.646,25 2.646,25 9.947,92
    Cash deposit of IMPSOL 6.350,00 5.300,00 5.416,60 5.133,00 22.199,60
    Plan to Support Town Halls 2013-2016 + repayable advance 2016 CHM 0,00 0,00
    Urban development + territ. ext. + ring roads 12.125,46 11.740,64 11.376,86 11.239,86 46.482,82

    BREAKDOWN OF SPENDING ON WASTE (2)

    (2) 2016 2017 2018 2019 TOTAL
    Controlled deposits 8.359,71 7.190,00 6.694,34 8.234,84 30.478,89
    Transfer plants 6.244,85 5.935,16 5.560,79 4.714,65 22.455,45
    Integrated waste management systems 27.754,79 28.269,68 30.692,23 32.493,49 119.210,19
    Ecoparks 108.732,10 107.362,12 109.366,36 110.695,28 436.155,86
    Composting plants 1.586,28 1.551,91 1.360,45 1.697,91 6.196,54
    Management of waste centres 3.102,40 3.305,22 3.220,60 3.199,88 12.828,10
    Subsidy to town halls for treatment plants 1.983,37 1.983,37 1.978,64 1.978,64 7.924,02
    Other expenses 3.611,06 4.580,77 4.574,63 6.041,25 18.807,71

    BREAKDOWN OF SPENDING ON THE COMPREHENSIVE WATER CYCLE (3)

    (3) 2016 2017 2018 2019 TOTAL
    Current water and rainwater expenses 3.620,24 1.190,58 1.018,98 97,51 5.927,30
    Sanitation + supply 57.714,30 52.427,77 55.328,70 63.888,55 229.359,32

    BREAKDOWN OF SPENDING ON TRANSPORT AND MOBILITY (4)

    (4) 2016 2017 2018 2019 TOTAL
    Contribution to the ATM 106.443,86 112.080,50 129.697,05 141.183,12 489.404,54
    Indirect management + PMR + Rate equalisation in 1st and 2nd ring 100.994,72 100.858,30 105.871,19 139.074,72 446.798,92
    Subsidised fares 34.901,57 31.571,20 31.580,72 33.169,24 131.222,74
    Bicibox 1.250,00 1.300,00 1.781,44 2.245,92 6.577,36
    Metropolitan Urban Mobility Plan 3.950,00 4.525,00 3.645,65 2.628,97 14.749,62
    Contributions to AMB INFORMACIÓ I SERVEIS SA 1.217,91 1.909,53 1.925,46 2.225,46 7.278,36
    Contribution to IMT 750,00 400,00 400,00 400,00 1.950,00
    Other expenses 2.118,00 3.315,43 3.084,71 2.595,28 11.113,42
  • Plans, investments and programmes
    The Metropolitan Investment Plan for the 2016-2019 mandate is allocated 269.66 million euros and has been used to finance investments in natural spaces, public spaces, infrastructures and facilities that serve as the backbone of the metropolitan region while also bringing value to the municipalities.

    The plan utilises cautious criteria in terms of income and the containment of structural spending. General economic scenarios, the evolution of budget implementation and the future economic prospects were taken into account when drawing it up. According to the current socioeconomic context, the investment plans deemed it necessary to establish and apply policies aimed at social and territorial cohesion.

    The principles of solidarity, cooperation and plurality inspired the Investment Plan with the goal of bringing a higher quality of life in the metropolitan municipalities. The AMB has paid special attention to applying criteria in favour of implementing local policies and improving the public space and citizens' quality of life by incorporating elements of sustainability and energy efficiency.
    • Metropolitan Investment Plan
      The essential areas of the Investment Plan have revolved around four areas: territorial cohesion, urban improvement, projects and technical assistance, and actions in natural and urban landscapes.

      The Regional Cohesion Action Programme (PACTE) was allocated 100 million euros and included actions carried out by the AMB itself both directly and in cooperation with the town halls. The investment, which went to 35 municipalities (not Barcelona, which has a plan of its own) was used for facilities, public spaces and infrastructures.

      The Action Programme for Urban and Social Improvement (PAMUS) was allocated an investment of 144.66 million euros in all the metropolitan municipalities (not including Barcelona) meant to finance the construction projects and town halls' interventions, along with the maintenance and ordinary financing actions of municipal services, facilities and actions targeted directly at users and citizens, including those of social interest and/or emergency.

      Much of the technical work needed to develop the programmes of the Metropolitan Investment Plan is carried out by the AMB's own technical services, which support the town halls. The technical support related to investment and management of the regional actions is increasingly complex, so the AMB services were reinforced in light of the requests from the town halls and the technical assistance plan was allocated 10 million euros.

      The Barcelona Metropolitan Area (AMB) has extensive experience and a longstanding tradition in planning and managing open spaces, such as metropolitan green infrastructures; solving problems of the fit between urban zones and their natural environment; integrating roadway, energy and service infrastructures within the landscape; and spearheading forest management programmes on municipal lands with a high risk of fire associated with harnessing waste for energy and farming. The investment in river spaces, the recovery of degraded zones and the integration of infrastructures had a budget of 15 million euros contained within the Action Programme in Natural and Urban Landscapes (PSG).

      Metropolitan Investment Plan 2016-2019 by municipality

      MUNICIPALITY Allocations of the Regional Cohesion Action Programme (PACTE) Allocations of the Action Programme for Urban and Social Improvement (PAMUS) TOTAL
      Badalona 13.283.364,00 9.112.098,24 22.395.462,24
      Badia del Vallès 1.056.571,04 315.403,20 1.371.974,24
      Barberà del Vallès 2.110.311,04 3.137.753,92 5.248.064,96
      Begues 497.151,03 623.116,48 1.120.267,51
      Castellbisbal 858.351,04 2.006.067,84 2.864.418,88
      Castelldefels 3.613.611,03 8.055.315,52 11.668.926,55
      Cerdanyola del Vallès 3.465.051,04 8.181.588,80 11.646.639,84
      Cervelló 618.371,03 494.957,12 1.113.328,15
      Corbera de Llobregat 897.191,03 968.860,48 1.866.051,51
      Cornellà de Llobregat 5.517.588,00 9.639.875,84 15.157.463,84
      Esplugues de Llobregat 2.683.071,03 3.394.144,32 6.077.215,35
      Gavà 2.771.811,04 3.816.400,00 6.588.211,04
      L'Hospitalet de Llobregat 15.423.896,00 15.020.449,92 30.444.345,92
      Molins de Rei 1.510.431,03 3.627.637,44 5.138.068,47
      Montcada i Reixac 2.226.011,04 5.104.823,36 7.330.834,40
      Montgat 787.671,04 1.224.704,32 2.012.375,36
      Pallejà 742.591,03 1.552.075,84 2.294.666,87
      La Palma de Cervelló 300.651,03 314.892,48 615.543,51
      El Papiol 356.231,03 744.123,52 1.100.354,55
      El Prat de Llobregat 3.863.931,04 5.230.061,76 9.093.992,80
      Ripollet 2.421.531,04 2.332.317,12 4.753.848,16
      Sant Adrià de Besòs 2.183.431,04 1.890.297,92 4.073.728,96
      Sant Andreu de la Barca 1.747.971,04 1.628.544,96 3.376.516,00
      Sant Boi de Llobregat 5.369.136,00 8.820.134,40 14.189.270,40
      Sant Climent de Llobregat 351.311,03 432.299,84 783.610,87
      Sant Cugat del Vallès 4.838.272,00 16.450.598,08 21.288.870,08
      Sant Feliu de Llobregat 2.606.871,03 5.141.214,40 7.748.085,43
      Sant Joan Despí 1.985.751,03 4.315.792,32 6.301.543,35
      Sant Just Desvern 953.571,03 2.340.567,04 3.294.138,07
      Sant Vicenç dels Horts 1.807.511,04 3.251.812,48 5.059.323,52
      Santa Coloma de Cervelló 586.211,03 882.515,20 1.468.726,23
      Santa Coloma de Gramenet 7.496.604,00 5.316.465,28 12.813.069,28
      Tiana 567.651,03 1.247.117,76 1.814.768,79
      Torrelles de Llobregat 455.091,03 339.843,84 794.934,87
      Viladecans 4.045.231,04 7.702.791,04 11.748.022,08
      Amount 100.000.000,00 144.656.662,08 244.656.662,08
      Projects and technical support 10.000.000,00
      Action Programme in Natural and Urban Landscapes (PSG) 15.000.000,00
      TOTAL 269.656.662,08
      Programme of collaboration on public space, facilities and the infraestructures of Barcelona municipalities 34.000.000,00

      Metropolitan Investment Plan 2016-2019
    • Economic activity and quality of life stimulus plan
      The metropolitan plan to support the town halls provides solutions to the economic needs of the metropolitan town halls while also promoting, supporting, underpinning and coordinating economic initiatives to generate a benefit in the institutions, citizens, companies and region.

      The Metropolitan Plan to Support Town Halls, Stimulate Economic Activity and Improve Quality of Life, which is allocated 160 million euros, is comprised of the following programmes:
      • Programme to support municipalities to finance the expropriation of green zones and municipal facilities
      • Programme to support municipal housing companies 
      • Building rehabilitation programme
      • Urban improvement programme
      • Programme to improve infrastructures and the competitiveness of industrial estates and economic activity areas
      Plan to Support Town Halls


      Plan to Support Town Halls, Stimulate Economic Activity and Improve Quality of Life

      PROGRAMES SUBVENCIÓ TOTAL PER PROGRAMES IMPORT APROVAT MANDAT ANTERIOR 2012-2015 IMPORT APROVAT MANDAT 2016-2019
      IMPORT % IMPORT % IMPORT %
      1- PROGRAMME TO SUPPORT MUNICIPALITIES TO FINANCE THE EXPROPRIATION OF GREEN ZONES AND MUNICIPAL FACILITIES 54.000.000,00 33,75% 15.364.007,63 28,59% 2.017.386,86 3,70%
      2- PROGRAMME TO SUPPORT MUNICIPAL HOUSING COMPANIES  46.000.000,00 28,75% 31.061.498,74 57,81% 3.306.824,45 6,07%
      3- BUILDING REHABILITATION PROGRAMME 23.000.000,00 14,38% 498.411,31 0,93% 21.613.248,68 39,64%
      4- URBAN IMPROVEMENT PROGRAMME 7.000.000,00 4,38% 4.866.398,31 9,06% 1.117.416,88 2,05%
      5- PROGRAMME TO IMPROVE INFRASTRUCTURES AND THE COMPETITIVENESS OF INDUSTRIAL ESTATES AND ECONOMIC ACTIVITY AREAS 30.000.000,00 18,75% 1.941.136,27 3,61% 26.464.343,34 48,54%
      160.000.000,00 100,00% 53.731.452,26 100,00% 54.519.220,22 100,00%
    • Metropolitan Plan to Support Municipal Social Policies
      The Metropolitan Plan to Support Municipal Social Policies finances projects aimed at generating direct jobs, promoting economic activity and improving the employability conditions of unemployed persons. It is grounded upon the metropolitan authority's action principle of fostering social cohesion.

      Throughout the 2016-2019 mandate, 30 million euros was allocated for 136 metropolitan town hall projects, with the exception of Barcelona, given its budgetary capacity and own service structure. The municipalities receive budgetary support according to their population, unemployment rate and disposable family income. This financing, in the guise of subsidies, is compatible with other assistance and financing funds.

      In addition to the 30 million euros of budget allocated, 6 million euros of pluriannual economic funds have still been available during the 2016-2019 mandate and have been allocated to measures to combat energy poverty.


      Metropolitan Programme to Support Municipal Policies 2016-2019

      Total allocation Approved price
      MUNICIPALITY/ PROJECT
      BADALONA 4.467.840,00 4.467.839,97
      1. Badalona: obrint portes a l'ocupació. Plans d'ocupació 2016-2017 1.973.920,00
      2. Badalona conviu: Plans d'ocupació 2017 260.000,00
      3. Suport a la gestió i coordinació dels plans d'ocupació 167.186,69
      4. Badalona, anem per feina. Plans d'ocupació 2018-19 2.066.733,28
      BADIA DEL VALLÈS 396.360,00 396.360,00
      1. Pla de suport al manteniment d'espais i equipaments públics i millora dels serveis a la ciutadania. 198.180,00
      2. Millora dels serveis a la ciutadania i dels equipaments i espais públics 2018-2019 198.180,00
      BARBERÀ DEL VALLÈS 641.400,00 641.400,00
      1. Dinamització social per a l'ocupació 170.700,00
      2. Barberà emprèn 34.800,00
      3. 6+6: Sumant esforços, empresa i societat 115.200,00
      4. Dinamització social per a l'ocupació 129.799,65
      5. Programa de foment de l'ocupació i cooperativisme per a la gestió d'uns horts socials-comunitaris municipals 64.140,00
      6. Barberà emprèn: Programa municipal per a l'autoocupació 41.760,35
      7. 4+8: Sumant esforços, empresa i societat 85.000,00
      BEGUES 87.120,00 65.340,00
      1. Neteja, manteniment i conservació de zones verdes i forestals municipals 15.291,31
      2. Peó forestal a l'Ajuntament de Begues 21.780,00
      3. Manteniment i conservació de la via pública i d'edificis públics municipals 28.268,69
      CASTELLBISBAL 210.720,00 210.720,00
      1. Pla de suport a les polítiques socials: Castellbisbal Ocupació 2016-2017 105.360,00
      2. Castellbisbal Ocupació 2018-2019 105.360,00
      CASTELLDEFELS 1.011.360,00 993.102,27
      1. Millora de serveis a la ciutadania 156.221,38
      2. Millora de serveis a la ciutadania 2017 327.852,76
      3. Millora de serveis a la ciutadania 2018 238.448,76
      4. Millora de serveis a la ciutadania 2019 238.579,37
      5. Consell comarcal "A la feina amb tu" 32.000,00
      CERDANYOLA 959.700,00 959.700,00
      1. Actuacions diverses d'interès públic al municipi de Cerdanyola del Vallès 479.850,00
      2. Millora de serveis i infraestructures a la població de Cerdanyola del Vallès 479.850,00
      CERVELLÓ 139.140,00 139.140,00
      1. Programa de suport a l'ocupació de l'Ajuntament de Cervelló 69.570,00
      2. Programa de suport a l'ocupació de l'Ajuntament de Cervelló 2018-2019 69.570,00
      CORBERA DE LLOBREGAT 198.360,00 198.360,00
      1. Corbera impulsa 99.180,00
      2. Corbera impulsa 2019 99.180,00
      CORNELLÀ DE LLOBREGAT 1.695.240,00 1.695.240,00
      1. Programa de millora de les actuacions de proximitat al ciutadà i de rehabilitació de l'espai públic 2016-2019. 1a fase 847.620,00
      2. Programa d'intervencions de millora al territori 847.620,00
      ESPLUGUES DE LLOBREGAT 732.540,00 732.540,00
      1. Generant oportunitats a Esplugues - Edició 2016 249.930,53
      2. Assignacions econòmiques a empreses i entitats per a la contractació de persones en situació d'atur 116.339,47
      3. Generant oportunitats a Esplugues de Llobregat 108.091,47
      4. Generant oportunitats a Esplugues de Llobregat. Sales blanques i talents 74.513,16
      5. Generant oportunitats a Esplugues de Llobregat. Contractació de persones en situació d'atur. Plans d'ocupació 183.665,37
      GAVÀ 840.960,00 840.946,46
      1. Pla de xoc a l'atur a Gavà (I) - Línia A - Plans de foment de l'ocupació 230.480,00
      2. Pla de xoc a l'atur a Gavà (II) - Línies B i C - Assignacions econòmiques 190.000,00
      3. Pla de xoc a l'atur- Ajuts a l'autoocupació 42.000,00
      4. Pla de xoc a l'atur- Ajuts a la contractació 42.000,00
      5. Pla de xoc a l'atur- Plans de foment de l'ocupació 212.827,26
      6. Pla de xoc a l'atur- Plans de foment de l'ocupació-Millora de l'entorn 75.639,20
      7. Consell Comarcal "A la feina amb tu" 48.000,00
      L'HOSPITALET DE LLOBREGAT 4.659.600,00 4.659.600,00
      1. Pla per a la reactivació i la millora de l'ocupació a l'Hospitalet. 2016-2018 2.074.040,00
      2. L'H Fem Empresa 155.760,00
      3. L'H Emprèn 100.000,00
      4. Pacte local pel comerç de l'Hospitalet 50.960,00
      5. Projecte Nerthus, promovent ocupació, acompanyant persones 2.128.840,00
      6. L'H Fem Empresa 50.000,00
      7. L'H Emprèn 100.000,00
      MOLINS DE REI 383.460,00 383.460,00
      1. Molins de Rei aposta per l'ocupació, primer període (dos semestres) 131.730,00
      2. Subvencions a empreses i entitats empresarials per a la contractació de persones aturades de Molins de Rei 45.000,00
      3. Subvencions a les persones aturades que s'estableixin com a autònomes per a la posada en marxa d'una activitat econòmica 15.000,00
      4. Molins de Rei aposta per l'ocupació, segon període (dos semestres) 131.730,00
      5. Subvencions a les persones aturades que s'estableixin com a autònomes per a la posada en marxa d'una activitat econòmica 15.000,00
      6. Subvencions a empreses i entitats empresarials per a la contractació de persones aturades de Molins de Rei. Convocatòria 2018 45.000,00
      MONTCADA I REIXAC 718.200,00 718.200,00
      1. Pla metropolità de suport a les polítiques socials municipals de Montcada i Reixac 2016-2017 359.100,00
      2. Pla de suport a les polítiques socials municipals de Montcada i Reixac 2018-2019 359.100,00
      MONTGAT 190.980,00 190.980,00
      1. Montgat amb la millora de la qualitat dels serveis municipals: un benefici per a la ciutadania 95.490,00
      2. Accions singulars per a la formació 10.000,00
      3. Accions singulars que ens acosten al mercat de treball 8.504,58
      4. Montgat per la millora de l'accessibilitat a la via pública 57.940,10
      5. Montgat un poble accessible a la informació 19.045,32
      PALLEJÀ 181.020,00 181.020,00
      1. Pla d'ocupació local de Pallejà 2016-2017 per a la millora de l'ocupabilitat 90.510,00
      2. Pla d'ocupació per a la millora de l'ocupabilitat 2018 90.510,00
      LA PALMA DE CERVELLÓ 48.600,00 48.600,00
      1. Auxiliar de la llar 2016-2017 24.300,00
      2. Arxiu digital 24.300,00
      EL PAPIOL 65.940,00 65.940,00
      1. Suport al departament informàtic de l'Ajuntament del Papiol 9.168,18
      2. Serveis de qualitat a l'Ajuntament del Papiol 23.801,82
      3. Suport a la brigada municipal del Papiol 2018/2019 32.970,00
      EL PRAT DE LLOBREGAT 1.206.240,00 1.206.240,00
      1. El Prat de les persones i l'ocupació 594.807,58
      2. El Prat de les persones i l'ocupació II 531.432,42
      3. Consell comarcal "A la feina amb tu" 80.000,00
      RIPOLLET 815.880,00 815.880,00
      1. Projecte de suport a les actuacions municipals (SAM) 394.920,70
      2. Programa generem ocupació amb empreses 6.000,00
      3. Suport a les actuacions municipals II SAM 2 407.940,00
      4. Suport administratiu al municipi de Ripollet (SAM4) 7.019,30
      SANT ADRIÀ DE BESÒS 858.120,00 858.120,00
      1. Foment de l'ocupació per a empreses que contractin persones desocupades 200.000,00
      2. Projecte de foment de l'autoocupació per a persones desocupades 71.603,54
      3. Projecte de suport a la creació d'ocupació i a la gestió administrativa pública 157.456,46
      4. PO Projecte de suport a la creació d'ocupació 2018 162.048,00
      5. Foment de l'ocupació per a empreses que contractin persones desocupades 136.600,00
      6. Foment de l'autoocupació per a persones desocupades 2018 44.600,00
      7. Escola d'oportunitats 85.812,00
      SANT ANDREU DE LA BARCA 518.280,00 518.280,00
      1. Sant Andreu avança IV 105.231,14
      2. Sant Andreu avança per l'ocupació III 141.908,86
      3. Sant Andreu amb els emprenedors 12.000,00
      4. Sant Andreu Avança VI 243.437,40
      5. Sant Andreu amb els emprenedors II 15.702,60
      SANT BOI DE LLOBREGAT 1.679.220,00 1.678.674,43
      1. Pla de suport a les polítiques socioeconòmiques de Sant Boi de Llobregat 2016-2017 520.846,03
      2. Fons per a projectes d'autoocupació 21.554,24
      3. Pla de suport a les empreses per a la contractació de persones en situació d'atur 2016-2017 131.154,05
      4. Actuacions del Pla suport a les polítiques socioeconòmiques de Sant Boi de Llobregat 714.064,43
      5. #esposibleSB 45.000,00
      6. Fons per a projectes d'autoocupació (2018-2019) 69.952,63
      7. Consell comarcal "A la feina amb tu" 80.000,00
      8. Pla de suport de les empreses per a la contractació de persones joves en situació d'atur 2019-2020 96.103,05
      SANT CLIMENT DE LLOBREGAT 57.540,00 57.540,00
      1. Manteniment de franges i zones forestals del municipi temporades 2016-2017 28.770,00
      2. Manteniment de franges i zones forestals al municipi temporada 2018 28.770,00
      SANT CUGAT DEL VALLÈS 1.006.260,00 994.511,05
      1. Subvencions per a la inserció laboral mitjançant el foment de l'autoocupació 120.000,00
      2. Subvencions per a la inserció laboral mitjançant el foment de la contractació per part d'empreses de persones en situació d'atur del municipi 277.985,39
      3. Coordinació de foment a l'ocupació 40.651,05
      4. Subvencions per a l'autoocupació - 2018 120.345,60
      5. Subvencions per a la contractació de persones aturades - 2018 32.000,00
      6. Coordinació foment a l'ocupació - 2018 68.209,20
      7. Plans d'ocupació - Apropem-nos (agents cívics) 207.319,81
      8. Impuls a la promoció econòmica a través del creixement empresarial, el networking i l'economia social 128.000,00
      SANT FELIU DE LLOBREGAT 720.300,00 685.225,39
      1. Projecte de suport al manteniment de proximitat i edificis públics - juliol 2016 257.137,48
      2. Projecte de suport a les direccions per a la planificació i gestió de projectes - octubre 2016 59.090,62
      3. Projecte de suport al manteniment de proximitat i edificis públics - abril 2018 126.456,67
      4. Projecte de suport al manteniment de proximitat i edificis públics - octubre 2018 198.618,72
      5. Pla de suport als serveis a la ciutadania 43.921,90
      SANT JOAN DESPÍ 520.980,00 520.980,00
      1. Programa d'ocupació local de suport a col·lectius en risc d'exclusió social 260.490,00
      2. Programa d'ocupació local de suport a col·lectius en risc d'exclusió social 248.716,10
      3. Programa d'ocupació local de col·lectius en risc d'exclusió social 2019 11.773,90
      SANT JUST DESVERN 187.740,00 187.740,00
      1. Plans d'ocupació de l'AMB 2016 a l'Ajuntament de Sant Just Desvern (Projecte A) 93.870,00
      2. Plans d'ocupació de l'AMB 2a convocatòria 2018-2019 a l'Ajuntament de Sant Just Desvern (Projecte A) 93.870,00
      SANT VICENÇ DELS HORTS 658.620,00 658.620,00
      1. Millora dels serveis oferts a la ciutadania de Sant Vicenç dels Horts 329.310,00
      2. Millora dels serveis oferts a la ciutadania de Sant Vicenç dels Horts 329.310,00
      SANTA COLOMA DE CERVELLÓ 111.540,00 111.540,00
      1. Manteniment i conservació de via pública, espais lliures o naturals, edificis i equipaments municipals. Fase 12 55.770,00
      2. Manteniment i conservació de via pública, espais lliures o naturals, edificis i equipaments municipals. Fase 14 26.148,48
      3. Suport en la intervenció amb adolescents i joves. Dinamitzador/a juvenil 29.621,52
      SANTA COLOMA DE GRAMENET 2.545.560,00 2.545.559,99
      1. Dinamització econòmica local per a la creació d'empreses 59.742,98
      2. Dinamització econòmica local per a la creació d'ocupació 974.065,10
      3. Actuacions ocupacionals per a la contractació de col·lectius prioritaris 972.773,63
      4. Dinamització econòmica local per a la creació d'empreses 300.006,36
      5. Dinamització de la restauració a Santa Coloma de Gramenet 238.971,92
      TIANA 106.200,00 106.200,00
      1. Tiana gaudeix el verd 53.100,00
      2. Tiana més verda 53.100,00
      TORRELLES DE LLOBREGAT 89.220,00 89.220,00
      1. Suport al manteniment d'equipaments i espais públics de Torrelles de Llobregat, 2017 44.610,00
      2. Serveis comunitaris de Torrelles de Llobregat 44.610,00
      VILADECANS 1.289.760,00 1.289.300,25
      1. Plans d'experienciació laboral 243.562,79
      2. Fem feina a Viladecans 2016-2017 401.317,21
      3. Projecte de plans d'experienciació laboral a Viladecans 314.420,25
      4. Foment de l'ocupació: Fem feina a Viladecans 2018 121.650,00
      5. Foment de l'autoocupació: Fem feina a Viladecans 128.350,00
      6. Consell comarcal "A la feina amb tu" 80.000,00
      TOTAL 30.000.000,00 29.912.119,81

      Table of allocations with the annual amounts 2016-2019 of the Metropolitan Programme to Support Municipal Policies 2016-2019

      Plan to Support Municipal Policies
    • Metropolitan Programme to Counter Energy Poverty. Pluriannual fund
      Energy poverty is becoming a structural problem in Catalonia, and in all of Spain as well, not only in the metropolitan area. In 2016, two years after the AMB's energy poverty programme was launched with a fund of 11 million euros, local governments had to apply the regulation contained in Law 24/2015. Meantime, the experience of many town halls suggested that unified municipal action protocols be implemented as they await legislative support.

      The goal of the metropolitan programme of measures to combat energy poverty is to provide an effective response to situations stemming from cut-offs in the energy and water supply because of a lack of economic resources. The government of the AMB considers it essential to help the metropolitan town halls deal with a reality suffered by many residents, especially those in situations of economic vulnerability, primarily the elderly, dependent persons and single-parent families made up of a woman with persons under her care.

      The programme established procedural agreements with the metropolitan town halls through their social services, as well as with the water, gas and electrical utility companies. The budget earmarked for the period 2016-2019 was 6 million euros, with the main goal, in accordance with the programme's objectives, of providing economic coverage to prevent utilities from being cut off in the wintertime for individuals suffering from energy poverty; to provide economically vulnerable consumers with information and training on invoicing, fares, possibilities and resources in the public systems and the household service systems; and finally to complement basic municipal social service assistance as well as the effects of the Metropolitan Plan to Support Municipal Social Policies and the Metropolitan Programme to Rehabilitate Buildings and Improve Neighbourhoods.

      The AMB has worked to prepare an energy audit programme, with households as the beneficiaries, to determine whether energy consumption can be rationalised with simple rehabilitations, such as improving homes' insulation.

      The 35 metropolitan municipalities have joined the programme, which is in talks with 12 utility companies. Because energy poverty is a structural problem in Catalonia as a whole, not only in the metropolitan area, the government of the AMB has asked the Spanish and Catalan governments for a supporting legislative framework that would create measures and resources to deal with this dire social plague.

      Metropolitan Programme to Counter Energy Poverty. Pluriannual fund

      Municipality Allocations 2016-2019
      Badalona 893.568,00
      Badia del Vallès 79.272,00
      Barberà del Vallès 128.280,00
      Begues 17.424,00
      Castellbisbal 42.144,00
      Castelldefels 202.272,00
      Cerdanyola del Vallès 191.940,00
      Cervelló 27.828,00
      Corbera de Llobregat 39.672,00
      Cornellà de Llobregat 339.048,00
      Esplugues de Llobregat 146.508,00
      Gavà 168.192,00
      L'Hospitalet de Llobregat 931.920,00
      Molins de Rei 76.692,00
      Montcada i Reixac 143.640,00
      Montgat 38.196,00
      Pallejà 36.204,00
      La Palma de Cervelló 9.720,00
      El Papiol 13.188,00
      El Prat de Llobregat 241.248,00
      Ripollet 163.176,00
      Sant Adrià de Besòs 171.624,00
      Sant Andreu de la Barca 103.656,00
      Sant Boi de Llobregat 335.844,00
      Sant Climent de Llobregat 11.508,00
      Sant Cugat del Vallès 201.252,00
      Sant Feliu de Llobregat 144.060,00
      Sant Joan Despí 104.196,00
      Sant Just Desvern 37.548,00
      Sant Vicenç dels Horts 131.724,00
      Santa Coloma de Cervelló 22.308,00
      Santa Coloma de Gramenet 509.112,00
      Tiana 21.240,00
      Torrelles de Llobregat 17.844,00
      Viladecans 257.952,00
      TOTAL 6.000.000,00
  • Investments in projects in the metropolitan municipalities
    List of actions in the metropolitan municipalities

    MUNICIPALITY ACTION FUNDING
    BADALONA
    Badalona MILLORA PAS SOTA FFCC AL PASSEIG MARITIM PACT
    Badalona PLA DE MILLORA DE CARRERS ( I. ALBENIZ, F. PLANAS I CASALS, VERDI I MÒNACO, PAU CASALS, VELEZ BLANCO, SGDA FAMILILA, GRAL WEYLER 1 i 2, ACER, MOLÍ DE LA TORRE I RIERA MATAMOROS ) PACT
    Badalona PLA DE REURBANITZACIÓ DE PLACES (LLOREDA, ANTONIA BOADA, PLAÇA ROJA) PÀCT/PACTE
    Badalona PLAÇA TRAFALGAR I ENTORNS 1a i 2a FASE PACTE
    Badalona PROJECTE DEL CARRER I PLAÇA AZORIN PACTE
    Badalona MILLORA PAISATGÍSTICA I DE LA MOBILITAT DE LA CARRETERA DE CAN RUTI PACTE
    Badalona CAMÍ AL PARC G-4 ENTRE EL C.CIÈNCIA I CAMÍ SANT JERONI DE LA MURTRA PACTE
    Badalona PLA DE MILLORA D'ACCESSIBILITAT ALS DISTRICTES 2 I 4: PASSATGE ALBERT LLANAS, OCEANIA, SOLSONA, FORTUNY I HIPÒLITO LÁZARO PACTE
    Badalona MILLORES MOBILITAT. APARCAMENT DE BICICLETES A L'ESTACIÓ DE METRO POMPEU FABRA I PROJECTE DE CARRIL CENTRAL ENTRE C. PRIM I MONTGAT AMB
    Badalona MILLORES AL PARC DE CAN SOLEI I CA L'ARNÚS FASE 1 I PROJECTE FASE 2 AMB
    Badalona PROJECTE DEL PARC DE NOVA LLOREDA FASE 1 PACT
    Badalona PASSERA I MILLORES DEL NOU PARC METROPOLITÀ DEL TORRENT DE LA FONT I TURO DE L'ENRIC, FASE I PACTE
    Badalona PROJECTE DEL JARDI DE L'HOSPITAL MUNICIPAL I ENTORNS
    Badalona URBANITZACIÓ DEL PARC DE CAN BADA PACTE
    Badalona PROJECTE DE MILLORES A LA PLATJA DELS PESCADORS PACTE
    BADIA DEL VALLÈS
    Badia del Vallès APARCAMENT CARRER SANTANDER CAME
    Badia del Vallès NOU PARC METROPOLITÀ DE JOAN OLIVER PACT
    Badia del Vallès PROJECTE DE MILLORA DEL COMPLEX ESPORTIU DE L'AVINGUDA TIBIDABO
    Badia del Vallès MILLORA DE L' ACCESSIBILITAT AL CARRER BÈTICA PACTE
    BARBERÀ DEL VALLÈS
    Barberà del Vallès CAMÍ RIU RIPOLL PACT
    Barberà del Vallès NOVA SEU DE LA POLICIA LOCAL A BARBERÀ DEL VALLÈS PACTE
    Barberà del Vallès ADEQUACIÓ ESPAIS US ASSOCIATIU I CULTURAL LA NAU PACTE
    Barberà del Vallès REMODELACIÓ DELS CARRERS DR. FERRAN I PINTOR MURILLO PACTE
    Barberà del Vallès MILLORES AL CAMP DE FUTBOL DEL BARRI DE LA ROMÀNICA PACTE
    Barberà del Vallès ORDENACIÓ D'ESPAIS I RAMPES D'ACCÉS A L'ESTACIÓ DE FERROCARRIL PACTE
    Barberà del Vallès MILLORES AL NOU PARC METROPOLITÀ DEL BOSC DE CAN GORGS AMB
    BARCELONA
    Barcelona ESCOLA ELS ENCANTS CONVENI AMB
    Barcelona EDIFICI DE MANTENIMENT I BANC DE GERMOPLASMA DEL JARDÍ BOTÀNIC CONVENI ICUB
    Barcelona PROJECTE DE NOU MERCAT MUNICIPAL DE SANT ANDREU AJUNTAMENT
    Barcelona PROJECTES DE MOBILITAT PER LA BICICLETA A LA ZONA FRANCA
    Barcelona VIA CICLABLE ENTRE BARCELONA I ESPLUGUES DE LLOBREGAT CONVENI AMB
    Barcelona PARC DE CAN RIGAL. MILLORES EQUIPAMENT I VEGETACIÓ
    Barcelona NOVA MEGAFONIA INTEL·LIGENT I WIFI A LES PLATGES AJUNTAMENT
    BEGUES
    Begues CAMÍ D'ACCÉS A L'INSTITUT I RIERA DE CAN FIGUERES PSG
    Begues ROTONDA CARRER AGRICULTURA PLA D'INVERSIONS 16-19
    Begues NOUS VESTIDORS, BAR I SALA SOCIAL AL CAMP DE FUTBOL AJUNTAMENT
    Begues CAL PURRÓS AJUNTAMENT
    Begues FASE I DE LES ZONES III I IV DEL DIPÒSIT CONTROLAT DE LA VALL D'EN JOAN OBRES D'EMERGÈNCIA
    Begues MILLORA DE LA PERMEABILITAT PER A VIANANTS A LA ROTONDA CAL VIDU, FASES II i III ALTRES
    Begues PROJECTE DE CONNEXIÓ DEL BARRI MAS FERRER AMB EL NUCLI URBÀ AJUNTAMENT
    Begues NOU PARC METROPOLITÀ DE LA COSTETA A LA PARELLADA PACTE + PSG
    Begues PROJECTE DE RESTAURACIÓ PAISATGÍSTICA I CLAUSURA DE LES FASES III i IV DEL DIPÒSIT CONTROLAT DE LA VALL D'EN JOAN AMB
    CASTELLBISBAL
    Castellbisbal CARRER MAJOR PACT
    Castellbisbal DOCTOR LLARC PACT
    Castellbisbal ACCÉS AL RIU LLOBREGAT PACT
    Castellbisbal RECUPERACIÓ DE LA MASÍA DE CAN PEDREROL DE DALT. AJUNTAMENT
    Castellbisbal CARRERS ORIENT, SANT MARC, MIQUEL BLANC I PLAÇA DEL SOL PACTE
    Castellbisbal PROJECTE D'URBANITZACIÓ DEL CARRER DE LA LLUNA AJUNTAMENT
    Castellbisbal MILLORES AL NOU PARC METROPOLITÀ DE L'ERMITA AMB
    CASTELLDEFELS
    Castelldefels INSTITUT VALÈRIA HALINÉ PACT
    Castelldefels NOU PASSEIG MARÍTIM TRAM III. VEGETACIÓ I ENLLUMENAT PACT
    Castelldefels PLA DE REURBANITZACIÓ DE CARRERS (CERVANCES FASE 1 I ANDALUSIA) PACTE
    Castelldefels PROJECTES DE MILLORA DE CARRERS (Av dels Banys, Mansió, Cervantes fase II)
    Castelldefels REHABILITACIÓ DE LA MASIA DE CAN ROCA DE BAIX PACTE
    Castelldefels PROJECTE D'AMPLIACIÓ DEL PASSEIG MARITIM TRAM II ALTRES
    Castelldefels PROJECTE D'URBANITZACIÓ PLAÇA CASTELL PACTE
    Castelldefels PROJECTE DE MOBILITAT I MILLORA URBANA DE LA ANTIGA C-245 AMB/GENERALITAT
    Castelldefels MILLORES D'EQUIPAMENTS, ACCESSOS I CAMINS AL PARC DEL CASTELL PACTE
    CERDANYOLA DEL VALLÈS
    Cerdanyola del Vallès COBRIMENT DE LES PISTES ESPORTIVES CAN XARAU PACTE
    Cerdanyola del Vallès PROJECTE D'AMPLIACIÓ DEL COMPLEX ESPORTIU MUNICIPAL CAN XARAU 1 FASE AJUNTAMENT
    Cerdanyola del Vallès REMODELACIO DE LA FAÇANA I ACCES NOU DEL MERCAT DE LES FONTETES PACTE
    Cerdanyola del Vallès CARRER MONTFLORIT AJUNTAMENT
    Cerdanyola del Vallès MILLORES EN L'ACCESSIBILITAT I ALTRES AL PARC DEL TURONET. PACTE
    CERVELLÓ
    Cervelló ACCESSSIBILITAT A LA LLAR D'INFANTS A LA PLAÇA DEL MESTRE PACTE
    Cervelló REHABILITACIÓ DEL GUAL AL CAMÍ DE LA RESCLOSA DE LA RIERA PSG
    Cervelló ORDENACIÓ DE LA ZONA ESPORTIVA I NOU SKATE PARK PACTE
    Cervelló MILLORES DEL PARC DE LA TIMBA FASE I I FASE II AMB
    Cervelló PROJECTE DE LA FASE II DEL PARC DE LA TIMBA I PASSERA SOBRE LA RIERA AJUNTAMENT
    Cervelló PROJECTES DE SANEJAMENT DELS NUCLIS DE CAN PAULET, CAN RAFAEL, CAN VIDAL I LES ROVIRES ALTRES,AMB
    CORBERA DE LLOBREGAT
    Corbera de Llobregat CONSOLIDACIÓ DEL POLIESPORTIU MUNICIPAL AJUNTAMENT
    Corbera de Llobregat PROJECTE DEL CARRER RAFAMANS PACTE
    Corbera de Llobregat PROJECTE DEL PARC DE LA RODA
    Corbera de Llobregat TEMPLET I MILLORES AL NOU PARC METROPOLITÀ DE LES PALMERES
    CORNELLÀ DE LLOBREGAT
    Cornellà de Llobregat BIBLIOTECA DE FONTSANTA-FATJÓ PACTE
    Cornellà de Llobregat BIBLIOTECA AL BARRI DE L'ALMEDA PACTE
    Cornellà de Llobregat AVANTPROJECTE DEL CASAL DE LA MEMÒRIA A CAN MARAGALL AT
    Cornellà de Llobregat ESCOLA DE MÚSICA A CAN BAGARIA-FASE I i II PACTE
    Cornellà de Llobregat REFORMA I AMPLIACIÓ DE LA PISCINA DE CAN MILLARS PACTE
    Cornellà de Llobregat REURBANITZACIÓ DE L'AVINGUDA DELS ALPS I PARC DE ROSA SENSAT PACTE
    Cornellà de Llobregat REORDENACIÓ DE L'AVINGUDA PABLO PICASSO AJUNTAMENT
    Cornellà de Llobregat PROJECTE DE MILLORA D'ACCESSIBILITAT DEL CARRER AVELLANER AJUNTAMENT
    Cornellà de Llobregat PROJECTE DE REURBANITZACIÓ DE L'ESPAI VERD DEL CARRER MONTSERRAT ROIG AJUNTAMENT
    Cornellà de Llobregat PLACES NARCÍS MONTURIOL I FRANCESC LAYRET AJUNTAMENT
    Cornellà de Llobregat PROJECTE DE MOBILITAT I MILLORA URBANA DE LA ANTIGA C-245 AMB/ajuntament/GENERALITAT
    Cornellà de Llobregat MILLORA DELS NOUS PARCS METROPOLITANS DEL CANAL DE LA INFANTA I CAN CORTS
    Cornellà de Llobregat SOTERRAMENT DE LÍNIES ELÈCTRIQUES
    EL PAPIOL
    El Papiol REURBANITZACIÓ DELS CARRERS MAJOR, ABAT ESCARRÉ I LA PÇA DE L'ESGLÈSIA PACTE
    El Papiol PROJECTE DE CONNECTIVITAT ENTRE EL PARC DE COLLSEROLA I EL PARC AGRARI PSG
    EL PRAT DE LLOBREGAT
    El Prat de Llobregat ENTORNS DEL PONT NELSON MANDELA PSG
    El Prat de Llobregat CAMÍ DE LA BUNYOLA PLA D'INVERSIONS 16-19
    El Prat de Llobregat REHABILITACIO DEL CENTRE CÍVIC PALMIRA DOMÈNECH (c/LO GAITER) AJUNTAMENT
    El Prat de Llobregat CARRERS TORTOSA I GIRONA PACTE
    El Prat de Llobregat VORERA DE LA RONDA SUD AL SEU PAS PEL PARC NOU AJUNTAMENT
    El Prat de Llobregat JARDINS JOAN SALVAT PAPASSEIT PACTE
    El Prat de Llobregat ROTONDA ENTRE L'AV. DEL REMOLAR I L'AV. DE L'ONZE DE SETEMBRE PACTE
    El Prat de Llobregat NOU PARC METROPOLITÀ DEL RIU I MILLORES AL PARC NOU AJUNTAMENT
    ESPLUGUES DE LLOBREGAT
    Esplugues de Llobregat PROJECTE D'AMPLIACIÓ DEL PONT AMB
    Esplugues de Llobregat Barcelona PROJECTE DE MILLORA DE L'ACCESSIBILITAT A L'AVINGUDA ESPLUGUES AT
    Esplugues de Llobregat TEATRE AUDITORI AJUNTAMENT
    Esplugues de Llobregat VIA CICLABLE ENTRE BARCELONA I ESPLUGUES DE LLOBREGAT PACTE
    Esplugues de Llobregat CARRER SEVERO OCHOA PACTE
    Esplugues de Llobregat MILLORES ALS PARCS METROPOLITANS DE CAN VIDALET I DE LA SOLIDARITAT AMB
    GAVÀ
    Gavà CARRER BERTRAN I GÜELL PACT
    Gavà POLIESPORTIU MARCEL·LI MORAGAS FASES 2 i 3 PACTE
    Gavà REHABILITACIÓ DE L'EDIFICI DE LA UNIÓ DE COOPERADORS PACTE
    Gavà CRITERIS D'ORDENACIÓ DE GAVÀ MAR AT
    Gavà PROJECTE AL CARRER BARCELONA AJUNTAMENT
    Gavà PROJECTE DE MOBILITAT I MILLORA URBANA DE LA ANTIGA C-245 AMB/ajuntament/GENERALITAT
    L'HOSPITALET
    Hospitalet de Llobregat CONSOLIDACIÓ CAN TRINXET: NOU TANCAMENT I MILLORES DE LA NAU LATERAL PACT
    Hospitalet de Llobregat MILLORES AL CAMP DE FUTBOL DEL GORNAL PACT
    Hospitalet de Llobregat MILLORES A LA PISTA ATLETISME PACT
    Hospitalet de Llobregat REHABILITACIÓ FAÇANA DE L'ANTIC EDIFICI DE CORREUS PACTE
    Hospitalet de Llobregat NOVA ÀREA DE JOCS INCLUSSIUS AL PARC DE LES PLANES PACTE
    Hospitalet de Llobregat MILLORA D'EDIFICIS MPALS (ESCOLA DE MÚSICA, CASALS CAN SERRA, BELLVITGE, ...) PACTE
    Hospitalet de Llobregat MILLORES DE L'ESPAI PÚBLIC: Vorera J. Tarradellas, Rbla de la Marina, Vergara, .... PACTE
    Hospitalet de Llobregat CARRER SEVERO OCHOA PACTE
    Hospitalet de Llobregat MILLORES ALS PARCS DE CAN BUXERES I DE LES PLANES AMB/ AJUNTAMENT
    LA PALMA DE CERVELLÓ
    La Palma de Cervelló NOU PARC METROPOLITÀ DE L'ERMITA DEL PLA DE SANT JOAN PACT
    La Palma de Cervelló CAMÍ DE VIANANTS ENTRE CAN VIDAL I EL NUCLI URBÀ PACTE
    MOLINS DE REI
    Molins de Rei MILLORES A LA PLANTA DE TRIATGE AMB
    Molins de Rei REHABILITACIÓ DE L'EDIFICI DEL MOLÍ I NOVA BIBLIOTECA MUNICIPAL PACT
    Molins de Rei POLIESPORTIU RICARD GINEBREDA, fases 1B, II i III PACT
    Molins de Rei CAMÍ DEL RIU LLOBREGAT, Fase II AMB/ AJUNTAMENT
    Molins de Rei REFORMA DE L'AV. DE BARCELONA I AV. DE VALÈNCIA PACTE
    Molins de Rei PROJECTE D'URBANITZACIÓ DE LA PLAÇA DEL MOLÍ FASE 1 PACTE
    Molins de Rei GUAL INUNDABLE AL RIU LLOBREGAT AMB/ AJUNTAMENT
    MONTCADA I REIXAC
    Montcada i Reixac MILLORA DE LA CONECTIVITAT AL BARRI DE MAS RAMPINYO PACTE
    Montcada i Reixac REMODELACIÓ D'UN TRAM DE L'ANTIGA CTRA. N-150 , Fase I PACTE
    Montcada i Reixac ROTONDA DE LA N-150 A LA CRUÏLLA AMB LA CARRETERA DEL CEMENTIRI ALTRES
    Montcada i Reixac ROTONDA PER ACCÉS AL POLÍGON INDUSTRIAL DE CAN CUIÀS ALTRES
    Montcada i Reixac MILLORES AL NOU PARC METROPILITÀ DE LA LLACUNA I AL DE LES AIGÜES AMB
    MONTGAT
    Montgat PLAÇA DE LA VILA I ENTORNS PACT
    Montgat PROJECTE DEL FRONT MARÍTIM DE MONTGAT ÀMBIT LA LLOTJA FASE 2 PACTE
    Montgat MILLORES AL PARC DEL TRAMVIA AMB
    PALLEJÀ
    Pallejà REFORMA DE LES PISTES EXTERIORS DEL CONJUNT POLIESPORTIU PACTE
    Pallejà COBERTA PER A LA PISTA DE LA ZONA ESPORTIVA PACTE
    Pallejà PROJECTE DE REMODELACIO DEL CARRER BELLAVISTA DES DEL NUM. 49 AL 87 AL BARRI DE FONTPINEDA AJUNTAMENT
    Pallejà MILLORES AL PARC DE LA MOLINADA AMB
    RIPOLLET
    Ripollet ROTONDA CARRER BALMES
    Ripollet AVANTPROJECTE DEL NOU ARXIU MUNICIPAL
    Ripollet REHABILITACIÓ I MILLORES EN EL CENTRE CULTURAL PACTE
    Ripollet PROJECTE REMODELACIÓ INTEGRAL DEL COMPLEX DEL POLIESPORTIU MUNICIPAL AT
    Ripollet REMODELACIÓ DEL CARRER DEL CALVARI (FASE 2) PACT
    Ripollet MILLORES AL PARC METROPOLITÀ DELS PINETONS. TORRENT TORTUGUER I NOU SKATE PACTE
    Ripollet MILLORES AL PARC METROPOLITÀ D'EN MASSOT. AMB
    SANT ADRIÀ DE BESÒS
    Sant Adrià de Besòs FAÇANA VERDA DEIXALLERIA
    Sant Adrià de Besòs BARRI BESÒS Fase III
    Sant Adrià de Besòs PROJECTE DE 2A FASE DE CAN RIGALT AJUNTAMENT
    Sant Adrià de Besòs PROJECTE DE LA REHABILITACIÓ DE L'EDIFICI BESÒS AJUNTAMENT
    Sant Adrià de Besòs PROJECTE DE REFORMA DEL COMPLEX ESPORTIU DEL BESÒS AJUNTAMENT
    Sant Adrià de Besòs PROJECTE DEL CASAL DE LA DONA, 2A FASE AJUNTAMENT
    Sant Adrià de Besòs PROJECTE DE TANCA DEL MUSEU D'HISTÒRIA DE LA IMMIGRACIÓ DE CATALUNYA AJUNTAMENT
    Sant Adrià de Besòs REURBANITZACIÓ DE L'AVINGUDA DE LA RAMBLETA PACTE
    Sant Adrià de Besòs PLA DE MILLORES DE CARRERS (Barcelona, Pereda, València, Lleida, Tarragona) AJUNTAMENT
    Sant Adrià de Besòs PROJECTE DE MILLORA URBANA AL c DE CARMEN AMAYA I PONT DELS PASSADORS
    Sant Adrià de Besòs PROJECTES DE CARRERS (PLATJA, TRAMUNTANA, J.ROYO I ST OLEGUER)
    Sant Adrià de Besòs MILLORES I AULA AMBIENTAL AL PARC METROPOLITÀ DEL LITORAL AMB
    SANT ANDREU DE LA BARCA
    Sant Andreu de la Barca ENTORN FLUVIAL AMB/ AJUNTAMENT
    Sant Andreu de la Barca PASSAREL·LA PER CONNECTAR EL CARRER ANOIA AMB EL PARC CENTRAL PACTE
    SANT BOI DE LLOBREGAT
    Sant Boi de Llobregat PROJECTE DE MOBILITAT I MILLORA URBANA DE LA ANTIGA C-245 AMB/ajuntament/GENERALITAT
    Sant Boi de Llobregat REHABILITACIÓ DEL PALAU MARIANAO (AMPLIACIÓ FASE I) AJUNTAMENT
    Sant Boi de Llobregat MILLORA DE L'ENTORN D'EQUIPAMENTS DE LA PARELLADA PACT
    Sant Boi de Llobregat CIUTAT COOPERATIVA FASES 2.1 I 2.2 i PROJECTES SECTORS B, C i D PACTE
    Sant Boi de Llobregat PROJECTE DE LA RONDA DE SANT RAMON ALTRES
    Sant Boi de Llobregat REURBANITZACIÓ C FRANCESC MACIÀ FASE 2 AJUNTAMENT
    Sant Boi de Llobregat MILLORES ACCESSIBILITAT CICLISTA AL PARC DE CAN DUBLER I CONNEXIÓ ENTRE PLAÇA AJUNTAMENT I ANELLA VERDA
    Sant Boi de Llobregat MIRADORS, MILLORES I PROJECTE DE NOVA PISCINA I LLAC BANYABLE AL PARC METROPOLITÀ DE LA MUNTANYETA AJUNTAMENT/ AMB
    Sant Boi de Llobregat PROJECTE DE LA PLAÇA DE LA REPUBLICA (MERCAT DE LA MUNTANYETA) AJUNTAMENT
    Sant Boi de Llobregat PROJECTE DE LA ROTONDA ENTRE L'AV. SALVADOR SEGUI I L'AV. ARAGÓ PACTE
    Sant Boi de Llobregat ROTONDA ENTRE L'AV. SALVADOR SEGUI I EL C. DEL GENERAL PRIM PACT
    SANT CLIMENT DE LLOBREGAT
    Sant Climent de Llobregat VIA CÍVICA
    Sant Climent de Llobregat BIBLIOTECA A CA L'ALTISENT PACTE I ALTRES
    Sant Climent de Llobregat PROJECTE DEL PARC METROPOLITÀ DEL TORRENT I ENTORNS DE CA L'ALTISENT PSG
    SANT CUGAT DEL VALLÈS
    Sant Cugat del Vallès PROJECTE D'URBANITZACIÓ DE L'AVDA CERDANYOLA AJUNTAMENT
    Sant Cugat del Vallès NOU PARC METROPOLITÀ AL BOSC DE VOLPELLERES, Fase I i PROJECTE fase II PACTE
    Sant Cugat del Vallès PLAÇA MIQUEL OLIVELLA AL BARRI DE LA FLORESTA AJUNTAMENT
    Sant Cugat del Vallès PLAÇA DEL CENTRE AL BARRI DE LA FLORESTA AJUNTAMENT
    SANT FELIU DE LLOBREGAT
    Sant Feliu de Llobregat PASSAREL·LA A LA RIERA COMERÇ PLA D'INVERSIONS 16-19
    Sant Feliu de Llobregat CASAL DE JOVES DE SANT FELIU DE LLOBREGAT PACTE
    Sant Feliu de Llobregat PROJECTE DE REMODELACIÓ DEL CENTRE CIVIC DEL BARRI ROSES AJUNTAMENT
    Sant Feliu de Llobregat REURBANITZACIÓ DEL CARRER DEL PLA I CARRER JAUME RIBAS AJUNTAMENT
    Sant Feliu de Llobregat CRUÏLLA DEL CARRER ROSES AMB EL CARRER JOSEP RICART AJUNTAMENT
    Sant Feliu de Llobregat CARRER DOCTOR BRUGAROLES AJUNTAMENT
    Sant Feliu de Llobregat MILLORA DE MOBILITAT: CARRER DE L'ARMENTERA I PROJECTE DE CONNEXIÓ ZONA POLÍGON INDUSTRIAL
    Sant Feliu de Llobregat REMODELACIÓ DE LA PLAÇA FRANCESC MACIÀ i DE LA PLAÇA RAFAEL ALBERTI AJUNTAMENT
    Sant Feliu de Llobregat GUAL INUNDABLE AL RIU LLOBREGAT
    Sant Feliu de Llobregat MILLORES AL NOU PARC METROPOLITÀ DEL LLOBREGAT
    SANT JOAN DESPÍ
    Sant Joan Despí PISTES DE PÀDEL TENNIS PACTE
    Sant Joan Despí CONSTRUCCIÓ DELS TANCAMENTS DE DUES FAÇANES AL POLIESPORTIU UGALDE AJUNTAMENT
    Sant Joan Despí PROJECTE DE LES PISTES DE PADEL AL COMPLEX ESPORTIU FRANCESC CALVET AJUNTAMENT
    Sant Joan Despí PROJECTE DEL CENTRE DE DIA PER A GENT GRAN AT
    Sant Joan Despí AMPLIACIÓ I REFORMA DEL POLIESPORTIU SALVADOR GIMENO AJUNTAMENT
    Sant Joan Despí VESTIDORS AL POLIESPORTIU DEL MIG AJUNTAMENT
    Sant Joan Despí PLA DE MILLORA DE CARRERS ( BON VIATGE, MAJOR, RIUS I TAULET, ST PANCRAÇ, ST FRANCESC DE SALES, PASSEIG DE MALUQUER, INDÚSTRIA...).... AMB I AJUNTAMENT
    Sant Joan Despí MILLORA DE L'ACCESSIBILITAT DEL C/ BALTASAR D'ESPANYA AJUNTAMENT
    Sant Joan Despí PROJECTE DE MILLORES DEL CAMP DE FUTBOL DEL BARRI CENTRE AJUNTAMENT
    Sant Joan Despí PROJECTE DE LA ZONA VERDA-AV. DE BARCELONA AJUNTAMENT
    Sant Joan Despí SOTERRAMENT DE LÍNIES D'ALTA TENSIÓ AMB I AJUNTAMENTS
    Sant Joan Despí MILLORES EQUIPAMENT I VEGETACIÓ DEL PARC METROPOLITÀ DE LA FONTSANTA AMB I AJUNTAMENT
    SANT JUST DESVERN
    Sant Just Desvern PLA DE CARRERS: CARRER PONT, DE LA CREU, ANSELM CLAVÉ, DOS DE MAIG, BALMES, FONT, PONCE DE LEÓN PLA D'INVERSIONS 16-19
    Sant Just Desvern PROJECTE DE DEIXALLERIA VERDA, Fases I i II AJUNTAMENT
    Sant Just Desvern ESTUDI PREVI DEL CORREDOR VERD TORREBLANCA-COLLSEROLA AT
    Sant Just Desvern ESTUDIS DE LA MILLORA HIDÀULICA, RIERA DE SANT JUST AT
    Sant Just Desvern MILLORES AL NOU PARC METROPOLITÀ DEL MIL·LENARI I AL DE LA FONTSANTA AMB
    SANT VICENÇ DELS HORTS
    Sant Vicenç dels Horts MILLORES A LA CARRETERA BV2002, fases i i II PACT
    Sant Vicenç dels Horts PARC DEL MAMUT VENUX PACT
    Sant Vicenç dels Horts CENTRE CULTURAL I CÍVIC PACTE
    Sant Vicenç dels Horts PROJECTE DEL NOU CENTRE CIVIC AL BARRI DE LA GUARDIA AJUNTAMENT
    Sant Vicenç dels Horts PROJECTE DE LA NOVA SEU DE LA POLICIA LOCAL A CAN COLL AT
    Sant Vicenç dels Horts REHABILITACIÓ DE CAN COMAMALA AJUNTAMENT
    Sant Vicenç dels Horts PROJECTE DE REHABILITACIÓ EDIFICI MUNICIPAL CAN ARAGALL AJUNTAMENT
    Sant Vicenç dels Horts CARRERS JACINT VERDAGUER I BARCELONA AT
    Sant Vicenç dels Horts URBANITZACIÓ DE LA FONT DEL LLARGARUT AJUNTAMENT
    Sant Vicenç dels Horts PROJECTE DE L'AVINGUDA MARE DE DEU DE LA MERCE AJUNTAMENT
    Sant Vicenç dels Horts PROJECTE DEL NOU ACCÉS A L'ANTIC EDIFICI DELS SALESIANS AJUNTAMENT
    Sant Vicenç dels Horts ZONA VERDA SITUADA AL C. CLAVEROL, ENTRE ELS CARRERS SANTA CLARA AJUNTAMENT
    Sant Vicenç dels Horts PLA DE CARRERS I CAMINS: CAMI VIES ADIF I CARRERS FUNDADORS, BRUC, PIO BAROJA I WALT DISNEY I PROJECTE DEL CARRER JACA AJUNTAMENT
    Sant Vicenç dels Horts XARXA CICLABLE A LA CARRETERA BV2002 I CARRERS DEL CASC URBÀ, ÀMBIT C1 i A1 AJUNTAMENT
    Sant Vicenç dels Horts PROJECTE DELS JARDINS DEL MOLI DELS FRARES AJUNTAMENT
    Sant Vicenç dels Horts GUAL INUNDABLE AL RIU LLOBREGAT AMB
    Sant Vicenç dels Horts MILLORES ACCESOS I EQUIPAMENT AL PARC METROPOLITÀ DEL PI GROS AJUNTAMENT
    SANTA COLOMA DE CERVELLÓ
    Santa Coloma de Cervelló APARCAMENT A L'ENTORN DEL CEMENTIRI MUNICIPAL PACTE
    Santa Coloma de Cervelló AMPLIACIÓ DEL PARC METROPOLITÀ DE CAN LLUC. FASES 1 I 2 PACTE
    SANTA COLOMA GRAMENET
    Santa Coloma de Gramenet MILLORES AL PARC METROPOLITÀ DE CAN ZAM fases I i II AMB
    Santa Coloma de Gramenet AULA D'EDUCACIÓ AMBIENTAL DEL PARC DE CAN ZAM AJUNTAMENT
    Santa Coloma de Gramenet PLA DE CARRERS: Sardana, Còrdova, Mozart, Sant Lluís, Av. Banús, Pompeu Fabra, passatge Xiprer, plaça Baró PACT
    Santa Coloma de Gramenet PROJECTES D'ESPAI PÚBLIC: Av. Sanatori, carrer Bruc, Rbla Sant Sebastià, Victor Hugo, UA1 del PERI STA COLOMA VELLA II, Anselm del Riu, plaça Alfons Comín, escales mecàniques als carrers Mallorca, Còrdova i Cabrera,
    Santa Coloma de Gramenet JARDINS BALANDRAU PACT
    Santa Coloma de Gramenet PL. MEDITERRANIA 2ª F PACT
    Santa Coloma de Gramenet PROJECTE DE REFORMA I MILLORES DE L'EQUIPAMENT D'ARXIU I BIBLIOTECA CENTRAL AJUNTAMENT
    Santa Coloma de Gramenet REHABILITACIÓ DE L'ANTIGA FÀBRICA CIBA I TRANSFORMACIÓ EN EQUIPAMENT DE NOUS USOS SOCIALS, SOLIDARIS I FEMINISTES, FASES I i II AJUNTAMENT
    Santa Coloma de Gramenet PROJECTE DE REMODELACIÓ DEL PAVELLÓ ESPORTIU MUNICIPAL NOU AJUNTAMENT
    Santa Coloma de Gramenet PROJECTE DEL CENTRE DE FORMACIÓ GRAMEIMPULS AL RECINTE ESPERIT SANT, fase II AJUNTAMENT
    Santa Coloma de Gramenet PROJECTE DE REPARACIÓ ESTRUCTURAL DEL PONT DE LA BV-5011 AJUNTAMENT
    Santa Coloma de Gramenet PROJECTE DELS ENTORNS DEL MUSEU TORRE BALLDOVINA I DEL MOLI D'EN RIBÉ AJUNTAMENT
    Santa Coloma de Gramenet PASSEIG LLORENÇ SERRA F2 I PONT VELL I PASSEIG SALZEREDA F1 i F2 AJUNTAMENT
    Santa Coloma de Gramenet PROJECTE DE L'ESPAI LLIURE DE L'ANTIGA ESCOLA SANT JUST I CARRERS ADJACENTS AJUNTAMENT
    Santa Coloma de Gramenet PROJECTE DE LA MILLORA DE L'ACCESSIBILITAT AL PARC DEL MOLINET AT
    TIANA
    Tiana CARRER MATAS DES DEL CARRER CASTELLAR FINS A LA PLAÇA DE LA VILA PACTE
    Tiana CARRIL BICI DE CONNEXIÓ DE TIANA A L'ESTACIÓ DE TREN AJUNTAMENT
    Tiana MILLORES I EQUIPAMENTS AL PARC METROPOLITÀ DEL TRAMVIA. AMB
    TORRELLES
    Torrelles de Llobregat PROJECTE D'ACCESSIBILITAT A TRES EQUIPAMENTS MUNICIPALS AJUNTAMENT
    Torrelles de Llobregat MILLORES CENTRE ESPORTIU MUNICIPAL AJUNTAMENT
    Torrelles de Llobregat PROJECTE DE CONNEXIÓ PEATONAL ENTRE CAN COLL I LA ZONA ESCOLAR AJUNTAMENT
    VILADECANS
    Viladecans PROJECTE DE NOU EQUIPAMENT CULTURAL I ESPORTIU A CAN GINESTAR
    Viladecans 3ª FASE REMODELACIÓ CARRERS BARRI SALES PACTE
    Viladecans PROJECTE DE MILLORA DEL PARC DE TORRE-ROJA
    Viladecans IMPLANTACIÓ DE CARRIL BICI A L'ANTIGA C-31 (ACCÉS A LA T1 DE L'AEROPORT) AJUNTAMENT
    Viladecans PROJECTE DE REMODELACIÓ DELS JARDINS MAGDALENA MODOLELL PACTE
    Viladecans PROJECTE DE MOBILITAT I MILLORA URBANA DE LA ANTIGA C-245 AMB/ajuntament/GENERALITAT
    Viladecans PARC DE CAN GINESTAR, NOVA INCORPORACIÓ A LA XARXA METROPOLITANA DE PARCS AMB
    VARIS
    Varis NOVA SENYALITZACIÓ DE LES PLATGES METROPOLITANES AMB
  • Communication
    The Metropolitan Action Plan (PAM) 2015-2019 states that the corporate communication policy should be enhanced with the goal of stating the institution's positioning and improving awareness of it among citizens. This goal, contained in the mandate's Corporate Communication Plan, has translated into the following communication goals:

    • To make the metropolitan administration visible and consolidate its positioning.
    • To make the institution more accessible to citizens, to report on it and to bring citizens into the core projects, services and assistance of the AMB's mandate.
    • To showcase the region: Metròpolis Barcelona.
    In order to position and share the institution and make it more accessible to citizens, the avenues of intervention and strands of the PAM aimed at spotlighting and communicating were determined, thus preventing the dispersion of both the messages and resources.

    The avenues of work and the communication strategy used to achieve these objectives are:

    • Continued development of the corporate identity and architecture of the AMB brand and reflect it in all its authorities and services. This point has been extremely important, since it has stayed with the technical teams as they created the name of the services and infrastructures, and the formal part has been designed and implemented in the region. The outcome has been an increase in the presence and visibility of the Barcelona metropolis administration. A corporate identity handbook has been created for each project.

    The projects have been:


    • 2015: Identifying all the fleets of electrical and hybrid vehicles, and for the metropolitan park network, design of the Jugatecambientals (environmental games and experimentation areas).

    • 2016: The Barcelona ring roads and the new Bicivia bicycle infrastructure.

    • 2017: The Sustainable Mobility Project, which includes the low-emissions zone of the Barcelona ring roads (ZBE BCN), park-and-ride car parks, shared cars and quick charging stations.

    • 2018: Solar-powered car charging stations and the BiTiBi bicycle parking (high-capacity Bicibox).

    • 2019: The new shared electric bicycle service, e-Bicibox, and the Metropolitan Parking app.


    Corporate identity handbooks

    • Dynamisation of the press office with the goal of guaranteeing information flow and content generation and reinforcement of the relationship with the media particularly by tracking the general press with the highest penetration in the region, the local press and the press specialising in topics related to the authorities of the AMB. This avenue has led to an increase in media impacts and optimal coverage of the news related to metropolitan projects and services.

    In this mandate, steady progress was made on the following avenues of intervention:

    • The struggle against air pollution and climate change. One standout is the AMB's 2016 initiative to spearhead a communication protocol with the media, metropolitan town halls and citizens in the event of a preventative warning and episodes of air pollution by NO2

    In 2018, this project led to the subsequent development, along with the Government of Catalonia and the Barcelona Town Hall, of a communication protocol with a media and citizen alert system that is activated in less than 24 hours in the event of a preventative warning and episodes of air pollution by NO2 or PM10, with the pertinent recommendations or restrictions.

    An intense relationship was also embarked upon with journalists and meteorologists in the regional media to report on storms that affect the metropolitan coastline.


    • Promotion of sustainable mobility, with particular attention to the development of infrastructures and services to encourage the presence of bicycles as a daily means of urban transport (Bicivia, Bicibox and e-Bicibox, BiTiBi, subsidies for purchasing electric bicycles), as well as the development of the high-performance metropolitan bus, with two new services (BusExpress and MetroBús) and the launch of the Metropolitan Urban Mobility Plan (PMMU).

    • Policies to combat inequalities and promote inclusive and sustainable economic development. Employment policies, industrial estate plan.

    • Showcasing natural systems and open spaces (metropolitan park network, metropolitan coastline and river spaces) as the major connectors of the biodiversity within the system and the generators of the metropolitan green infrastructure.

    • Reporting on the metropolitan area's challenges with regard to waste collection and treatment. The Metropolitan Plan to Prevent and Manage Municipal Resources and Waste (PREMET25) was also launched.

    • New energy models: Climate and Energy Plan 2030.

    It is worth highlighting that in this mandate, news and reports were regularly generated in video format which were distributed both via YouTube and in newsletters and social media with the AMB's profiles.

    In this mandate, a channel to interact with the media and journalists was created in 2018 on the social media Twitter (@premsaAMB), which currently has 922 followers.

    Press office output

    2015 2018
    Press releases 110 133 20,90%
    Articles and online news items 185 384 107,56%
    Press conferences 42 33 -21,42%
    Vídeos - 44 -
    Tweets (journalists) - 330 -
    Articles published 177 367 107,34%
    Media requests 26 91 250,00%

    Ratcheting up the press office has led to a considerable increase in the number of requests from the media and serves as proof that the AMB is becoming a referent within its authorities. The most common kind of requests are: participation in a debate table, interviews and statements on policies or technical referents, filming to create documentaries or reports on our services, and information requests to make reports on our authorities or services.

    Communication protocol for preventative warnings in air pollution episodes
    Press service

    • Communication actions and campaigns: the communication actions and campaigns carried out throughout this mandate followed a maxim already determined in the previous mandate: to ensure the efficient use of resources by unifying the awareness-raising actions on waste sorting into a single metropolitan-wide campaign, which used to be carried out separately in each municipality, and in the sphere of transport, to develop single campaigns for the metropolitan services, which the concessionaires previously handled separately.
    All of these projects and actions require citizens' involvement and changes in habits. This is why a slogan was developed that appears in all the campaigns, "Canviar d'hàbits és tan important com l'aire que respires" (Changing habits is as important as the air you breathe), along with a website where citizens can find all the relevant information on changing their habits: www.canvidhabits.com

    In terms of air quality, an annual transversal, multimedia campaign has been promoted to mitigate air pollution in the region.

    In 2016, the AMB focused on an awareness-raising and informative actions on the high pollution levels suffered by the region; in 2017, circulation restrictions for polluting vehicles in the low-emissions zones of the Barcelona ring roads were announced in the event of preventive warnings or episodes of air pollution; and in 2018, it was announced that these restrictions also affect motorcycles.

    In terms of the energy shift, in late 2018 the new metropolitan energy utility, Barcelona Energia, was established, which started its own communicative actions.